Preparation for the HEC 1999 Test Beam

Here are photos, obtained from TRIUMF

Three mated modules after rotation are ready to go in the cryostat 39 Kb The mated modules on the rotator (at 45 degrees) 42 Kb
The HEC-2 modules with all the outer connecting bars in place 56 Kb The HEC-2 modules with two connecting bars still missing 55 Kb
The happy assembly team with three mated HEC-1 modules 45 Kb The inner tie-bars assembled on the HEC2 modules 82 Kb


Last modified October 11, 1999